Close Menu
  • Home
  • Feature
  • News
  • Opinion
  • Photo Stories/Events
  • Report
Facebook X (Twitter) Instagram
  • About TheNumbersNG
  • Contact Us
Facebook Instagram
TheNumbersNGTheNumbersNG
  • Home
  • Feature
  • News
  • Opinion
  • Photo Stories/Events
  • Report
TheNumbersNGTheNumbersNG
Home » First Niger Bridge to Close Sept. 7 for Two Weeks Over Emergency Repairs
News

First Niger Bridge to Close Sept. 7 for Two Weeks Over Emergency Repairs

September 4, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Federal Ministry of Works has announced the full closure of the First Niger Bridge in Onitsha, Anambra State, for two weeks to allow emergency maintenance and rehabilitation works.

The bridge will be closed to traffic from Monday, September 7, to Monday, September 21, 2026, according to the Acting Federal Controller of Works in Anambra State, Timothy Emenike.

Emenike made the disclosure on Friday, September 4, urging motorists and other road users to take note of the closure and make alternative travel arrangements.

The Federal Government said the emergency intervention became necessary because of the deteriorating condition of the bridge, particularly its carriageway surface and some structural components affected by vandalisation.

According to the ministry, portions of the bridge’s expansion-joint steelwork, as well as some stanchion, steel truss nuts and bolts, have been damaged.

David Umahi, the Minister of Works, reportedly expressed concern about the condition of the bridge during a recent working visit to Anambra State and directed that emergency maintenance and rehabilitation should begin immediately.

The ministry has consequently directed SKECC, the contractor handling the Km 0+000–Km 20+000 section of the Onitsha-Enugu Dual Carriageway, to commence the emergency works.

During the closure, motorists travelling between Anambra and Delta states, as well as those heading to destinations beyond Delta, have been advised to use the Second Niger Bridge.

The recommended route is through Obosi towards Asaba, Delta State, according to the Federal Ministry of Works.

The ministry said traffic diversion arrangements, road signs, safety barriers and traffic-control personnel would be deployed to guide motorists and protect road users and construction workers throughout the maintenance period.

The emergency works are expected to be completed by September 21, after which the First Niger Bridge is expected to reopen to traffic.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Elvis Eromosele

Related Posts

FG Opens Applications for N2.5 Billion Grant for 50 Student Innovators

September 4, 2026

Afrinvest Foundation Boosts Digital Inclusion with ICT Centre at Kano Emir’s Palace

September 4, 2026

Trump’s Venezuela Oil Deal Sparks Fury Over US Control of 65 Billion Barrels

September 4, 2026
Add A Comment
Leave A Reply Cancel Reply

You must be logged in to post a comment.

TheNumbersNG
  • About TheNumbersNG
  • Contact Us
© 2026 TheNumbersNG.

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.