Close Menu
  • Home
  • Feature
  • News
  • Opinion
  • Photo Stories/Events
  • Report
Facebook X (Twitter) Instagram
  • About TheNumbersNG
  • Contact Us
Facebook Instagram
TheNumbersNGTheNumbersNG
  • Home
  • Feature
  • News
  • Opinion
  • Photo Stories/Events
  • Report
TheNumbersNGTheNumbersNG
Home » Nigeria Loses 225,000 bpd as Shell Shuts Bonga FPSO for Major Maintenance
News

Nigeria Loses 225,000 bpd as Shell Shuts Bonga FPSO for Major Maintenance

February 2, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

 

Nigeria’s crude oil output has dropped by about 225,000 barrels per day following the commencement of a major maintenance programme on Shell’s Bonga Floating Production Storage and Offloading (FPSO) vessel, one of the country’s largest deepwater assets.

Shell Nigeria Exploration and Production Company Limited (SNEPCo) said the scheduled turnaround maintenance is aimed at extending the operational life of the Bonga FPSO by 15 years and improving long-term safety and efficiency.

“The maintenance is designed to ensure the FPSO continues to operate safely and efficiently for the next 15 years, while reducing unplanned production deferments and strengthening the asset’s resilience,” said Ronald Adams, Managing Director of SNEPCo.

He added that production is expected to resume in March 2026, following the completion of the works.

The maintenance scope includes statutory inspections, regulatory certification, integrity upgrades, engineering modifications, and subsea assurance activities intended to support sustained offshore operations.

Located about 120 kilometres offshore in water depths of over 1,000 metres, the Bonga FPSO has a capacity to produce 225,000 barrels of oil per day and 150 million standard cubic feet of gas daily, making it a critical contributor to Nigeria’s oil revenues and energy security.

The timing of the shutdown is significant, coming after joint venture partners approved a final investment decision (FID) in 2024 on Bonga North. This subsea tie-back project will depend on the FPSO’s processing capacity. Completion of the current maintenance is considered vital to preparing the facility for the additional production load.

The Bonga FPSO last underwent turnaround maintenance in October 2022 and reached a major milestone in February 2023, delivering its one billionth barrel of oil since production began in 2005.

SNEPCo operates the Bonga field under a production sharing contract with NNPC Limited, alongside partners Esso Exploration and Production Nigeria (Deepwater) Limited and Nigerian Agip Exploration Limited.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Elvis Eromosele

Related Posts

.NG Domain Adoption Alarmingly Low Despite Nigeria’s Digital Boom, NIRA Warns

June 12, 2026

Tinubu Honours 50 June 12 Heroes, Including Fagbenle, Otitoju, Alake

June 12, 2026

FCMB Appoints Bismarck Rewane as Board Chairman

June 12, 2026
Add A Comment
Leave A Reply Cancel Reply

You must be logged in to post a comment.

TheNumbersNG
  • About TheNumbersNG
  • Contact Us
© 2026 TheNumbersNG.

Type above and press Enter to search. Press Esc to cancel.

Ad Blocker Enabled!
Ad Blocker Enabled!
Our website is made possible by displaying online advertisements to our visitors. Please support us by disabling your Ad Blocker.